    IEC 62271-100新舊標(biāo)準(zhǔn)差異——關(guān)合和開(kāi)斷試驗(yàn)的規(guī)定

    來(lái)源:電工電氣發(fā)布時(shí)間:2018-09-13 09:13 瀏覽次數(shù):755
    IEC 62271-100新舊標(biāo)準(zhǔn)差異——關(guān)合和開(kāi)斷試驗(yàn)的規(guī)定
     
    閻玉萍1,賈德海2,曹堅(jiān)1,徐秀紅1,陳晨1
    (1 蘇州電器科學(xué)研究院股份有限公司,江蘇 蘇州 215104;
    2 國(guó)網(wǎng)內(nèi)蒙古東部電力有限公司物資分公司,內(nèi)蒙古 呼和浩特 010020)
     
        摘 要:介紹了高壓交流斷路器標(biāo)準(zhǔn)IEC 62271-100:2017-06(2.2 版) 中關(guān)合和開(kāi)斷試驗(yàn)的各項(xiàng)規(guī)定的修訂情況,該標(biāo)準(zhǔn)對(duì)關(guān)合和開(kāi)斷試驗(yàn)的各項(xiàng)規(guī)定進(jìn)行了詳細(xì)的說(shuō)明,與舊標(biāo)準(zhǔn)IEC 62271-100:2012-09(2.1 版) 進(jìn)行了比較,分析了附加要求、關(guān)于試驗(yàn)方法的一般考慮、試驗(yàn)前的操作、試驗(yàn)后斷路器的狀態(tài)燃弧時(shí)間的說(shuō)明等方面的差異,供相關(guān)技術(shù)人員進(jìn)行參考。
        關(guān)鍵詞:斷路器;IEC 62271-100 標(biāo)準(zhǔn);差異;關(guān)合和開(kāi)斷
        中圖分類(lèi)號(hào):TM762.1+4     文獻(xiàn)標(biāo)識(shí)碼:B     文章編號(hào):1007-3175(2018)09-0063-07
     
    Differences Between New and Old Standard IEC 62271-100----Provisions for Making and Breaking Tests
     
    YAN Yu-ping1, JIA De-hai2, CAO Jian1, XU Xiu-hong1, CHEN Chen1
    (1 Suzhou Electrical Apparatus Science Research Institute Co., Ltd, Suzhou 215104, China;
    2 State Grid East Inner Mongolia Material Supply Company, Hohhot 010020, China)
     
        Abstract: Introduction was made to the revision situation of IEC62271-100:2017-06 (edition 2.2) about miscellaneous provisions for making and breaking tests of high-voltage alternating-current circuit-breakers. This standard carried out particular specifications for miscellaneous provisions for making and breaking tests. This paper compared the new edition with IEC 62271-100: 2012-09 (edition 2.1) , analyzing the differences about the additional requirements, general considerations concerning testing methods, no-load operations before tests, condition of circuit-breaker after tests and demonstration of arcing times for the corresponding technical personnel’s reference.
        Key words: circuit-breaker; standard IEC62271-100; difference; making and breaking
     
    參考文獻(xiàn)
    [1] International Organization for Standardization/International Electrotechnical Commission. High-voltage switchgear and controlgear-Part100: Alternating-current circuit-breakers: IEC 62271-100:2012-09(edition 2.1)[S]. Switzerland: International Electrotechnical Commission,2012:99-127.
    [2] International Organization for Standardization/International Electrotechnical Commission. Highvoltage switchgear and controlgear–Part100: Alternating-current circuit-breakers: IEC 62271-100:2017-06(edition 2.2)[S]. Switzerland: International Electrotechnical Commission,2017:95-132.
    [3] 全國(guó)高壓開(kāi)關(guān)設(shè)備標(biāo)準(zhǔn)化技術(shù)委員會(huì). 高壓交流斷路器:GB 1984—2014[S]. 北京:中國(guó)標(biāo)準(zhǔn)出版社,2014:53-69.
    [4] International Organization for Standardization/International Electrotechnical Commission.Highvoltage switchgear and controlgear–Part100: Alternating-current circuit-breakers: IEC 62271-100:2008-04( edition 2.0)[S]. Switzerland: International Electrotechnical Commission,2008:91-116.

     

    亚洲无码av成人在线,亚洲影院AV无码一区二区,亚洲无码第二页,成人无码AV网站在线观看不卡 (function(){ var bp = document.createElement('script'); var curProtocol = window.location.protocol.split(':')[0]; if (curProtocol === 'https') { bp.src = 'https://zz.bdstatic.com/linksubmit/push.js'; } else { bp.src = 'http://push.zhanzhang.baidu.com/push.js'; } var s = document.getElementsByTagName("script")[0]; s.parentNode.insertBefore(bp, s); })();