用100%有功負載電流替代閉環電流開斷試驗的討論
胡醇,楊英杰
(蘇州電器科學研究院股份有限公司,江蘇 蘇州 215104)
摘 要:為了保證滿足應用要求,新設計的高壓交流負荷開關必須進行相應的型式試驗。通過對負荷開關有功負載電流開斷試驗瞬態恢復電壓受電源側阻抗占比影響的分析,討論了TDload2試驗時端口TRV參數等于或者嚴于TDloop 的TRV參數的條件,以及滿足TDloop試驗條件時對TDload2試驗嚴酷度的影響,給出用100% 有功負載電流試驗替代閉環電流試驗的條件,并對負荷開關標準中相關的表述提出修改建議。
關鍵詞:有功負載電流試驗(TDload2);閉環電流試驗(TDloop);瞬態恢復電壓(TRV);電源側阻抗占比
中圖分類號:TM564.2;TM83 文獻標識碼:B 文章編號:1007-3175(2020)03-0049-03
Discussion on the Breaking Test by Replacing the Closed Loop Current with 100% Active Load Current
HU Chun, YANG Ying-jie
(Suzhou Electrical Apparatus Science Academy Co.,Ltd, Suzhou 215104, China)
Abstract: To meet the application requirements, the newly designed high voltage AC load switch must undergo corresponding type tests. By analyzing the effect of supply side impedance ratio on transient recovery voltage (TRV) in active load current breaking test of load switch, the condition that the TRV parameters of open contacts of circuit-breaker in the TDload2 are equal to or stricter than those in the TDloop, and the effect of meeting the condition of TDloop on TDload2 severity were discussed, the condition for replacing the closed loop current test with 100% active load current test was given, and suggestions for modifying the relevant expressions in load switch standard were provided.
Key words: active load current test (TDload2); closed current test (TDloop); transient recovery voltage (TRV); supply side impedance ratio
參考文獻
[1] 全國高壓開關設備標準化技術委員會. 高壓交流負荷開關:GB/T 3804—2017[S]. 北京:中國標準出版社,2017:18.
[2] International Electrotechnical Commission. Hign-voltage switchgear and controlgear-Part 103:Switches for rated voltages above 1 kV up to and including 52 kV:IEC 62271-103 Edition 1.0[S].Geneva:International Electrotechnical Commission Publication,2011:28.