(Shougang Jingtang United Iron and Steel Joint Co., Ltd, Tangshan 063200, China)
Abstract: The second phase project of a large iron and steel plant was put into operation, and this plant has a capacity of 15 million tonsper year, requiring two independent 220 kV power supply points, but there was only one power supply point due to the weakness of the surrounding grid. After analyzing the points, like power balance, power flow distribution, short-circuit level, safety and stability, and investment,two schemes were proposed to solve the problem of the expansion of the iron and steel plant. After analyzing and studying the two proposed schemes, it was decided to adopt scheme 1, which is to keep the existing internal power supply network and system connection scheme unchanged,and plan to add a 220 kV substation when the steel plant reaches a scale of 20 million tons per year.
Key words: iron and steel plant; independent power supply; load; power balance; short-circuit level
參考文獻(xiàn)
[1] 鄭新芳. 電力工程設(shè)計(jì)中電力系統(tǒng)規(guī)劃設(shè)計(jì)的應(yīng)用分析[J]. 河南科技,2015(23) :150-153.
[2] 許紋碧. 隨機(jī)復(fù)雜電力系統(tǒng)穩(wěn)定性分析與應(yīng)用研究[D]. 上海:上海交通大學(xué),2015.
[3] 魏震波,茍競(jìng). 復(fù)雜網(wǎng)絡(luò)理論在電網(wǎng)分析中的應(yīng)用與探討[J]. 電網(wǎng)技術(shù),2015,39(1) :279-287.
[4] 蘇先杰. 電力系統(tǒng)的穩(wěn)態(tài)潮流控制分析研究[J] .科技創(chuàng)新與應(yīng)用,2017(12) :189.
[5] 江寧強(qiáng),黃暢想. 基于 fsolve 的電力系統(tǒng)潮流計(jì)算[J] . 電氣電子教學(xué)學(xué)報(bào),2017,39(1) :98-101.
[6] 李惜玉,陳俊坡,周可盈. 基于 Matlab/Simulink 與 PSASP 的潮流計(jì)算[J]. 實(shí)驗(yàn)科學(xué)與技術(shù),2017,15(1) :46-49.
[7] 蔡節(jié)鑾. 電力系統(tǒng)中的變電安全運(yùn)行故障及對(duì)策分析[J]. 通訊世界,2017,33(9) :215-216.
[8] 徐文娟,李勇,李玥. 基于多元回歸對(duì)電力系統(tǒng)負(fù)荷影響因素的計(jì)量分析[J]. 齊齊哈爾大學(xué)學(xué)報(bào)( 自然科學(xué)版),2017,33(3) :1-6.
[9] 廖庭堅(jiān), 劉光曄, 雷強(qiáng), 等. 計(jì)及電動(dòng)機(jī)負(fù)荷的電力系統(tǒng)動(dòng)態(tài)等值分析[J] . 電網(wǎng)技術(shù),2016,40(5) :1442-1446.
[10] 何邁,劉俊勇,任瑞玲,等. 電力系統(tǒng)運(yùn)行狀態(tài)大數(shù)據(jù)分析實(shí)驗(yàn)仿真[J] . 實(shí)驗(yàn)室研究與探索,2017,36(1) :73-79.