高壓斷路器失步開(kāi)合試驗(yàn)方法的評(píng)述
吳盛剛,張建新,趙建沛,王鵬飛,周躍剛
河南省高壓電器研究所,河南 平頂山 467001
摘 要:闡述了高壓斷路器進(jìn)行失步開(kāi)合試驗(yàn)的多種試驗(yàn)線路及其試驗(yàn)條件,并比較了各自的優(yōu)缺點(diǎn)。根據(jù)試驗(yàn)站的具體設(shè)備條件,選取了便于實(shí)施的變壓器雙聯(lián)電路和并聯(lián)電壓引入回路,并計(jì)算了126 kV 級(jí)試驗(yàn)回路的參數(shù),對(duì)相應(yīng)的瞬態(tài)恢復(fù)電壓TRV 波形進(jìn)行了仿真,其結(jié)果符合預(yù)期要求,故可以實(shí)施。
關(guān)鍵詞:高壓斷路器;失步開(kāi)合試驗(yàn);變壓器雙聯(lián)電路;并聯(lián)電壓引入回路;瞬態(tài)恢復(fù)電壓波形仿真
中圖分類(lèi)號(hào):TM834;TM561 文獻(xiàn)標(biāo)識(shí)碼:B 文章編號(hào):1007-3175(2013)11-0036-03
Review on Out-Of-Phase Making and Breaking Test Method of High-Voltage Circuit Breaker
WU Sheng-gang, ZHANG Jian-xin, ZHAO Jian-pei, WANG Peng-fei, ZHOU Yue-gang
Henan High Voltage Electric Apparatus Research Institute, Pingdingshan 467001, China
Abstract: Description was made to the multiple test circuits and the test conditions of high-voltage circuit breakers in carrying out out-of-phase making and breaking test and comparison was made to their advantages and disadvantages. According to the actual test conditions in test station, this paper selected transformer double-circuit which is convenient to carry out and parallel voltage injection circuit and calculated parameters of 126 kV level test loop. Simulation was carried out for the relevant transient recovery voltage waveforms. The result is in conformity with the expected requirements, so it can be implemented.
Key words: high-voltage circuit breaker; out-of-phase making and breaking test; transformer double circuit; parallel voltage injection circuit; transient recovery voltage waveform simulation
參考文獻(xiàn)
[1] GB 1984-2003 高壓交流斷路器[S].
[2] GB/T 4473-2008 高壓交流斷路器的合成試驗(yàn)[S].