變電站電量管理系統的研究
曹娜,朱婷婷
國網寧夏電力公司吳忠供電公司,寧夏 吳忠 751100
摘 要:針對現有電量管理及采集系統所存在的不足,利用VB6.0 和SQL Server2000 軟件開發了一種針對變電站運維班組的電量管理系統。該系統在現有電量管理系統基礎上增加了導入數據文件、多功能查詢、導出報表、遠程連接等功能,可將從電量采集系統導出的數據文件直接導入到電量管理系統中,也可在任一變電站內將數據保存到服務器上,并直接從系統中導出電量報表,避免做重復性工作。該系統彌補了現有電量管理系統的不足,減少了變電站運維人員的工作量。
關鍵詞:電量管理;變電站;平衡率;遠程連接
中圖分類號:TM63 文獻標識碼:A 文章編號:1007-3175(2014)06-0055-04
Study of Substation Power Management
CAO Na, ZHU Ting-ting
Wuzhong Power Supply Company of Ningxia Electric Power Company of State Grid, Wuzhong 751100, China
Abstract: Aiming at the insufficiency existing in the power management and collection system at present, this paper used VB 6.0 and SQL Server 2000 software to develop a kind of power management system in allusion to operation and maintenance shifts in substation. The system has added guiding-in data document, multifunction inquiry, guiding out report forms, remote connection etc functions on the basis of the existing power management system, being able to directly guide in the data document guided out from the power collection system to the power management system, to save the data into the server in any substation and to directly guide out power report forms from the system, to avoid doing the repetitive work. The system makes up the insufficiency of the existing power management system, reducing the working quantity of operation and maintenance personnel in substation.
Key words: power management; substation; balance rate; remote connection
參考文獻
[1] 阮宵君, 龔嵐, 黃鐵江. 淺談引起電量采集系統異常的原因及處理方法[J]. 浙江電力,2009,28(5):71-73.
[2] 蔡敏,劉海英,汪杰.Visual Basic 數據庫開發工程案例[M]. 北京:人民郵電出版社,2007.
[3] 郭瑞軍,唐邦民,謝晗昕.Visual Basic 數據庫開發實例精粹[M]. 北京:電子工業出版社,2005.
[4] 譚瑩宇,熊巍. 基于C/S 結構和SQLServer2000的醫院動態查詢系統的設計[J].計算機與現代化,2007(11):68-70.